Est. 2014 · Europe
MX3D
Amsterdam, Netherlands
Multi-axis robotic metal printing. The stainless steel canal bridge in Amsterdam was the proof. Wire-arc additive manufacturing for structure.
Known valuation
Published number not in the file yet. If you have a valuation they disclosed, tell Future of Built. The form is below.
Known clients
Publicly named customers on jobs - not a complete list.
- Amsterdam (canal bridge)
- fabricators
- City of Amsterdam (canal bridge)
- WAAM fabricators
Works with
OEMs, platforms, accelerators. The names on the door - including cohorts, not awards.
- Autodesk
- ArcelorMittal (historic)
Awards
No industry award in the file yet - BuiltWorlds, Constructech, CES, RBR50, TIME. Accelerators sit under Works with.
Intro
Do not ping the vendor cold. Tell us the trade. We send it to Future of Built and MX3D.
Notes
2025-06
The printed steel bridge in Amsterdam is still the slide - the cells shipped
Wire-arc additive. Fabricators, not a sculpture garden.

