Building machine
All robots

Prefab · Deployed

Building machine

A factory that climbs the tower.

CSCEC Third Bureau’s 200-ton residential building machine. It sits on the structure, encloses the floor, and rises with the job - a floor in four days in Urumqi. The swing stage is the spare.

Mass
200 t
HQ
Wuhan
Pace
~4 days/floor

Same trade